Installation and User Manual

Power-Sure™ 700 Performance Checklist (Continued)

9.Input/Output Voltage Checks (Adjust as needed):
No Load InputNo Load Output

A-B____________VAC B-C____________VAC A-C____________VAC

AN____________VAC A-B____________VAC BN____________VAC B-C____________VAC CN____________VAC A-C____________VAC

10.

Available Load InputAvailable Load Output

A-B____________VACAN____________VAC

B-C____________VACBN____________VAC

A-C____________VACCN____________VAC

11.Input/Output Current Checks (Balance as needed):

A-B____________VAC B-C____________VAC A-C____________VAC

Input

Output

A____________AmpsA____________Amps

B____________AmpsB____________Amps

C____________AmpsC____________Amps

N____________Amps

G____________Amps

12.Fans Operational:

_________________________________________________________________________________________

13.Testing Shutdown Circuitry ie...REPO, Over/Under Voltage:

_________________________________________________________________________________________

14.Comments:

_________________________________________________________________________________________

_________________________________________________________________________________________

_________________________________________________________________________________________

_________________________________________________________________________________________

86-108814-00 B01

Maintenance

3 —3