Installation

Installation

￿Do not install a lockable or slide door in the pivoting area of the dryer door.

Transporting the dryer to the installation site

The rear overhang of the lid has transport grips.

￿Use the front dryer feet and the rear overhang to transport the dryer from the packaging base to the installation site.

Level the dryer

The dryer must be level to ensure safe and proper operation.

￿The machine can be leveled by turning the legs clockwise or counterclockwise as necessary.

￿An air gap of 3/8" (10 mm) must be provided between the machine and the floor. The vents must not be blocked by toe kicks, long piled carpet, etc.

The appliance is not intended to be mounted in a wall or other vertical surface of a building or cabinet. The unit is allowed for built-in application.

￿The machine may not be operated without the lid in place.