Installation

Installation on a cement base

Coin mechanism

￿Secure the front feet of the dryer with retaining clips on the cement base.

The dryer can be equipped with a coin mechanism (optional accessory). Miele’s Technical Service will install the coin mechanism and program the electronic.

Empty the coin mechanism regularly to avoid jams.

￿Do not install devices to automatically turn the dryer off, e.g. clock timers.

38

Page 38
Image 38
Miele PT 7136 PLUS installation manual Installation on a cement base Coin mechanism