Mitsumi electronic PLA-ABA Suspension structure Give site of suspension, strong structure Fig

Models: PLA-ABA

1 56
Download 56 pages 54.94 Kb
Page 4
Image 4
(inch)

3. Installing the indoor unit

 

 

(inch)

 

120

 

7/32

 

120

*6-

 

 

3-17/32 3-15/16 3-15/16 3-17/32

 

 

3-15/16

5-1/8

 

70°

*6-3/32

*6-9/16

 

13-25/32

 

 

Fig. 3-4

 

 

3.4. Branch duct hole and fresh air intake hole (Fig. 3-4)

At the time of installation, use the duct holes (cut out) located at the positions shown in Fig3-4, as and when required.

A fresh air intake hole for the optional multi function casement can also be made.

Note:

The figure marked with * in the drawing represent the dimensions of the main unit excluding those of the optional multi function casement.

When installing the optional multi function casement, add 135 mm, 5-5/16 inch to the dimensions marked on the figure.

When installing the branch ducts, be sure to insulate adequately. Otherwise condensation and dripping may occur.

Branch duct hole

14-ø2.8 mm, ø1/8 inch burring hole

Indoor unit

ø150 mm, ø5-29/32 inch cut out hole

Fresh air intake hole

ø175 mm, ø6-7/8 inch burring hole pitch

Drain pipe

Fresh air intake hole diagram

Refrigerant pipe

3-ø2.8 mm, ø1/8 inch burring hole

Branch duct hole diagram

ø125 mm, ø4-29/32 inch burring hole pitch

(view from either side)

ø100 mm, ø3-15/16 inch cut out hole

 

Ceiling

3.5. Suspension structure (Give site of suspension

strong structure) (Fig. 3-5)

Fig. 3-4 Unit

(inch)

• The ceiling work differs according to the construction of the building. Building

3.5. Suspension structure (Give site of suspension Grille

Pillar

 

23-

 

13/16

 

-57/64

 

31

Ceiling

Use inserts rated at 100-150 kg, 220

Rafter

-331 lbs each (procure locally)

Beam

Suspension bolts M10 (3/8") (procure

Roof beam

locally)

 

Steel reinforcing rod

constructors and interior decorators should be consulted for details.

(1)Extent of ceiling removal: The ceiling must be kept completely horizontal and

the ceiling foundation (framework: wooden slats and slat holders) must be rein- forced in order to protect the ceiling from vibration.

(2)Cut and remove the ceiling foundation.

(3)Reinforce the ends of the ceiling foundation where it has been cut and add ceil- ing foundation for securing the ends of the ceiling board.

(4)When installing the indoor unit on a slanted ceiling, attach a pillar between the ceiling and the grille and set so that the unit is installed horizontally.

Wooden structures

Use tie beams (single storied houses) or second floor beams (two story houses) as reinforcing members.

Wooden beams for suspending air conditioners must be sturdy and their sides must be at least 6 cm, 2-3/8 inch long if the beams are separated by not more than 90 cm, 35-7/16 inch and their sides must be at least 9 cm, 3-9/16 inch long if the beams are separated by as much as 180 cm, 70-7/18 inch. The size of the suspension bolts should be ø10 (3/8"). (The bolts do not come with the unit.)

strong structure) (Fig. 3-5) Ferro-concrete structures

 

Min. 1-3/16

 

9/64)

+3/16 0

(9-2

-1/8

11/16

4

Fig. 3-6

Fig. 3-5

 

Suspension bolt

(inch)

 

Ceiling

 

 

Nut

 

 

Washer (with insulation)

 

 

Mounting plate

 

 

Washer (without insulation)

 

 

Check using the Installation gauge

 

+3/16

0

 

A=11/16

 

3.6. Unit suspension procedures (Fig. 3-6) Main unit

Manual background Ceiling

Manual background Gauge

Manual background Ceiling opening dimensions

Fig. 3-7

Manual background Main unit

Manual background Ceiling

Manual background Installation template (top of the package)

Manual background Screw with washer (Accessory)

Secure the suspension bolts using the method shown, or use steel or wooden hangers, etc. to install the suspension bolts.

3.6. Unit suspension procedures (Fig. 3-6)

Suspend the main unit as shown in the diagram.

Figures given in parentheses represent the dimensions in case of installing optional multi function casement.

1.In advance, set the parts onto the suspension bolts in the order of the washers (with insulation), washers (without insulation) and nuts (double).

Fit the washer with cushion so that the insulation faces downward.

In case of using upper washers to suspend the main unit, the lower washers (with insulation) and nuts (double) are to be set later.

2.Lift the unit to the proper height of the suspension bolts to insert the mounting plate between washers and then fasten it securely.

3.When the main unit can not be aligned against the mounting hole on the ceiling, it is adjustable owing to a slot provided on the mounting plate.

Make sure that A is performed within 17-22 mm, 11/16 to 7/8 inch. Damage could result by failing to adhere to this range. (Fig. 3-7)

Manual background Caution:

Use the top half of the box as a protective cover to prevent dust or debris from getting inside the unit prior to installation of the decorative cover or when applying ceiling materials.

3.7. Confirming the position of main unit and tightening the suspension bolts (Fig. 3-8)

Using the gauge attached to the grille, ensure that the bottom of the main unit is properly aligned with the opening of the ceiling. Be sure to confirm this, otherwise

condensation may form and drip due to air leakage, etc.

• Confi rm that the main unit is horizontally levelled, using a level or a vinyl tube

fi lled with water.

• After checking the position of the main unit, tighten the nuts of the suspension

bolts securely to fasten the main unit.

• The installation template (top of the package) can be used as a protective sheet to

prevent dust from entering the main unit when the grilles are left unattached for a

while or when the ceiling materials are to be lined after installation of the unit is fin-

Fig. 3-8

ished.

*As for the details of fitting, refer to the instructions given on the Installation tem- plate.

4

Page 4
Image 4
Mitsumi electronic PLA-ABA Suspension structure Give site of suspension, strong structure Fig, Installing the indoor unit