Monessen Hearth SBV500, SBV400 manual Pre-Installationinformation, D F G C A E, Corner Installation

Models: SBV400 BBV400 SBV500

1 42
Download 42 pages 53.86 Kb
Page 7
Image 7
D

PRE-INSTALLATION INFORMATION

FIREPLACE FRAMING

Firebox framing can be built before or after the appliance is set in place. Construct firebox framing following Figure 2 and the chart below for your specific installation requirements. See Figure 3 on Page 8 for firebox dimensions. The framing headers may rest on the top of the firebox standoffs.

The firebox may be installed directly on a combustible floor or raised on a platform of an appropriate height. When the firebox is installed directly on carpeting, tile, or other combustible material, other than wood flooring, the firebox shall be installed on a metal or wood panel extending the full width and depth of the enclosure.

WARNING

Do not fill spaces around firebox with insulation or other materials. This could cause a fire.

D

F

G

Corner InstallationCStud Location

A

E

 

BBV400

SBV400

SBV500

 

 

 

 

A

401/2"

401/2"

461/2"

B

401/4"

401/4"

401/4"

C

313/8"

2413/16"

3013/16"

D

161/8"

131/2"

161/2"

E

611/4"

677/8"

737/8"

F

305/8"

34"

37"

G

141/2"

211/2"

211/2"

H

433/8"

48"

521/4"

C

Corner Installation

B

A

Stud Location

 

 

 

 

 

 

 

 

 

 

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1/2" or 5/8"

 

 

Inside Chase Installation

C

G

A

Recessed Installation

Figure 2 - Framing Dimensions

62D4036

7

Page 7
Image 7
Monessen Hearth SBV500 Pre-Installationinformation, D F G C A E, Corner Installation, Stud Location, Recessed Installation