STEP 2 Outlet Programming
NOTE:
All PowerCenter outlets located on the rear panel are “programmable”. In order to program each outlet pair, you must use the recessed slide switches (fig.2). There are two recessed slide switches for each outlet pair that enable you to program between ”unswitched“, ”switched on“, and ”switched on after delay“ settings. You can change the settings, when necessary. Using the outlet pair labeled 1 as an example, the following diagrams illustrate how to program the outlets:
Figure 2
OUTLETS ALWAYS ON (UNSWITCHED):
UNSWITCHED SWITCHED DELAY NO DELAY
1
Figure 2a
OUTLETS SWITCHED ON:
UNSWITCHED SWITCHED DELAY NO DELAY
1
Figure 2b
OUTLET PROGRAMMING SWITCHES
UNSWITCHED SWITCHED | DELAY NO DELAY |
| |
1 |
|
| |
2 |
|
| |
3 |
|
| |
4 |
|
| |
5 |
|
| |
SHORT | LONG | DELAY TIME | |
(6 seconds) | (20 seconds) SWITCH | ||
DELAY | NO DELAY | TRIGGER OUT | |
SWITCH | |||
|
|
DC OUT 9~12V 300MA
OUTLETS SWITCHED ON
AFTER DELAY:
UNSWITCHED SWITCHED DELAY NO DELAY
1
Figure 2c
SHORT |
|
|
| LONG |
| DELAY TIME | ||
(6 seconds) |
|
|
| (20 seconds) | SWITCH | |||
|
|
| ||||||
| Figure 2d |
|
| |||||
DELAY |
|
|
| NO DELAY | TRIGGER OUT | |||
|
|
| ||||||
|
|
| SWITCH | |||||
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
Figure 2e
7