gb12bw/bs/bp LIgHTINg sYsTeM • operaTIoN aNd parTs MaNuaL — rev. #0 (06/24/13) — page 25

reMovINg THe proTeCTIve CoverINg (gb12bs)

1. Expose the balloon by pulling down on the velcro tab
and unzipping the protective cover as shown in
Figure 31.
Figure 31. Removing Balloon/AC Power Cord
2. Next, fold the protective cover (Figure 32) into itself
and zip.
Figure 32. Folding Protective Cover
VELCRO
TAB
PROTECTIVE
COVER
ZIPPER
PROTECTIVE
COVER

setuP (Gb12bs)

3. Attach both S-type hooks (Figure 33) on the AC power
cable into the cable support holes on the offset pole.
Figure 33. Attachment of S-Hooks

B

OFFSET
POLE
S-TYPE
HOOK
POWER
CABLE