NETGEAR GS748T manual Chapter Installation, Preparing the Site

Models: GS748T

1 42
Download 42 pages 44.32 Kb
Page 25
Image 25
Chapter 4

Chapter 4

Installation

This chapter describes the installation procedures for your NETGEAR GS748T Gigabit Smart Switch. Switch installation involves the following steps:

1.Preparing the site

2.Installing the switch

3.Checking the installation

4.Connecting devices to the switch

5.Installing an SFP GBIC module

6.Applying AC power

7.Switching management through a Web Browser or Utility Program (initial configuration)

Step 1: Preparing the Site

Before you install your switch, ensure that your operating environment meets the environmental requirements in Table 4-1.

Table 4-1. Site Requirements

Characteristics

Requirements

 

 

Mounting

 

 

 

Installations

Desktop: provide a flat table or shelf surface

 

 

 

Rack-mount: use a 19-inch (48.3-centimeter) EIA standard equipment rack

 

that is grounded and physically secure. You also need the rack-mount kit

 

supplied with your switch.

 

 

Access

Locate the switch in a position that lets you access the front panel RJ-45

 

ports, view the front panel LEDs, and access power connector.

 

 

Power source

Provide a power sourcea within 6 feet (1.8 meters) of the installation location.

 

Ensure that the AC outlet is not controlled by a wall switch, which can

 

accidentally turn off power to the outlet and the switch.

 

 

Environmental

 

 

 

4-1

v1.0, January 2007

Page 25
Image 25
NETGEAR GS748T manual Chapter Installation, Preparing the Site