New Buck Corporation 94NC installation instructions Final Check

Models: 94NC

1 29
Download 29 pages 51.28 Kb
Page 20
Image 20
FINAL CHECK

FINAL CHECK

1.Recheck specified clearances.

2.Remove all foreign material from firebox area.

3.Open primary air control. Primary Air Controls: The primary air intake control is located at right bottom side of hearth. It is operated by moving the handle out to open (to allow air into the firebox) or in (to control or close off) air into the firebox.

4.

Plug

power cord into a 115V AC outlet when to see if motor and blower works. “Do not

 

run power cord under unit or in high traffic areas”.

 

5.

Place crumpled pieces of newspaper in stove. Light it and close

door. Ensure

 

that

stove draws properly through primary draft.

 

6.

Check for smoke leaks around door.

 

CAUTION

Open door and check for smoke escaping from front of the stove. Smoking usually indicates a defective or poorly positioned chimney. Some chimneys with a marginal draft can be preheated by lighting newspaper and holding it near open damper with a poker or fire tong. Once chimney heats up, a proper draft can usually be obtained.

If a thorough review of Troubleshooting Guide in rear of manual does not reveal problem, contact your dealer for assistance.

CAUTION

The unit is painted with a specially formulated high temperature paint that cures during the first two or three firings. You may notice a slight smoking effect and an odor of burning paint when you build the first fires. This is normal and is not a cause for alarm. In some cases, these fumes will activate a smoke alarm. Opening a window near unit will allow these fumes to escape. DO NOT build a large, roaring fire until this curing is complete or heater finish may be damaged.

Page 18

Page 20
Image 20
New Buck Corporation 94NC installation instructions Final Check