CEILING APPLICATION – COMPLETE INSTALLATION

SW10JM INSTALLATION – CEILING APPLICATION

CEILING APPLICATION – COMPLETE INSTALLATION

New/Existing Construction

1. Use template to determine a suitable installation location. Place the SW10JM cardboard template in the desired location making sure the template is level and aligned correctly. You may want to staple the template in place for added ease.

Template

2a.Measure the width between the joists/studs and cut two 2 X 4’s to match this width. The 2 X 4’s will be used to cross brace between joists.

X Minimum

2 x 4

X

Width Needed

 

Studs

2b.Locate 2 x 4’s at end of template as shown. Position each 2 x 4 and attach to trusses using applicable local building methods.

Template

X Minimum

Width Needed

3a.Mark 4 hole locations from template. This area will be used for the grille cutout.

3b.Cut thru ceiling between marks (drywall, sheetrock, etc.) using appropriate tools

Drywall Saw

Frame Cut-out

 

 

Hole Cut-out

 

 

 

Bottom View

(CONTINUED ON NEXT PAGE)

16

Page 18
Image 18
Niles Audio SW10JM, SW10WM manual CEILING APPLICATION - COMPLETE INSTALLATION New/Existing Construction