SW10JM INSTALLATION – CEILING APPLICATION
CEILING APPLICATION – BEFORE DRYWALL APPLIED
1. Use template to determine a suitable installation location. Place the SW10JM cardboard template
in the desired location making sure the template
is level and aligned correctly. You may want to Template staple the template in place for added ease.
2a.Measure the width between the joists/studs and cut two 2 X 4’s to match this width. The 2 X 4’s will be used to cross brace between joists.
2b.Locate 2 x 4’s at end of template as shown. Position each 2 x 4 and attach to trusses using applicable local building methods.
X Minimum X Width Needed
Template
2 x 4
X Minimum Width Needed
3. Attach the supplied front and rear brackets to the 2 x 4’s using the supplied 1.5" screws.
NOTE: REMOVE THE STOP BLOCK FROM THE SW10JM PORT. THE STOP BLOCK IS INCLUDED TO PREVENT THE SUBWOOFER FROM DISENGAGING FROM BRACKETS UNTIL THE GRILLE IS INSTALLED.
Screws Rear Bracket
Front Bracket 2 x 4
2 x 4
NILES AUDIO CORPORATION – |
| 13 |
|