
SW10JM INSTALLATION – FLOOR APPLICATION
FLOOR APPLICATION – BEFORE FINAL FLOORING APPLIED
Pre-Construction Floor
1. Use template to determine a suitable installation location. Place the SW10JM cardboard template in the desired location
making sure the template is level andTemplate aligned correctly. You may want to staple the template in place for added ease.
2a.Measure the width between the joists/ studs and cut two 2 X 4’s to match this width. The 2 X 4’s will be used to cross brace between joists.
2b.Position each 2 X 4 according to template. Attach each 2 X 4 to the floor joists using applicable local building methods.
Template
X Minimum
Width Needed
X Minimum | 2 x 4 | |
X | ||
Width Needed | ||
|
➊ Frame
3a.Mark 4 hole locations from template. This area will be used for the grille cutout.
3b.Cut thru
➋ ➍
Hole
Bottom View
NILES AUDIO CORPORATION – |
| 7 |
|