Hardware requirements 31

Figure 4

Items in the Ethernet Routing Switch 8306 chassis shipping container

Other equipment

In addition to the items that are included in the Ethernet Routing Switch 8310 and 8306 chassis accessory package you must also supply other items. Before you install the hardware, ensure that you have all the cables, tools, and other equipment that you need. The following sections describe the equipment you must supply:

“Management console” (page 31)

“Cables” (page 32)

“Mounting hardware for the 8310, 8306 chassis” (page 32)

Management console

To configure startup options and to monitor the results of startup diagnostics, you can attach an optional PC, or laptop, VT-100 console or an equivalent, such as a PC terminal emulator.

Nortel Ethernet Routing Switch 8300

Installation — Chassis

NN46200-309 01.01 Standard

16 June 2008

Copyright © 2008 Nortel Networks

Page 31
Image 31
Nortel Networks 8306, 8310 manual Other equipment, Management console