Nortel Networks 8310, 8306 manual Installing the cable guides

Models: 8310 8306

1 68
Download 68 pages 38.83 Kb
Page 40
Image 40
Procedure job aid: Maximum number of chassis installed in 7-foot rack

40Ethernet Routing Switch 8310 and 8306 chassis installation

--End--

Procedure job aid: Maximum number of chassis installed in 7-foot rack

The following table shows the maximum number of chassis that you can install in a 7-foot rack.

Chassis

Maximum number of chassis installed in 7-foot rack

 

 

8310

3

 

 

8306

4

 

 

Installing the cable guides

Install the cable guides to keep cable clusters fastened and out of the way, but still accessible for maintenance.

Nortel Ethernet Routing Switch 8300

Installation — Chassis

NN46200-309 01.01 Standard

16 June 2008

Copyright © 2008 Nortel Networks

Page 40
Image 40
Nortel Networks 8310 Installing the cable guides, Procedure job aid Maximum number of chassis installed in 7-foot rack