Novatel SMART ANTENNA user manual 3.7Built-InStatus Tests, 3.8DATUM Support, Chapter, Operation

Models: SMART ANTENNA

1 49
Download 49 pages 1.86 Kb
Page 26
Image 26
3.7Built-In Status Tests

Chapter 3

Operation

 

 

3.7Built-In Status Tests

The receiver performs self-tests and generates status information to provide an indication of the operational readiness and to facilitate maintenance actions.

The built in test monitors system performance and status to ensure the receiver is operating within its specifications. If an exceptional condition is detected, you are informed through one or more indicators. The receiver status system is used to configure and monitor these indicators:

Message ID# 49, Receiver Status Data

Message ID# 51, Initiated BIT Result

Please refer to the SUPERSTAR II Firmware Reference Manual for details on the Message IDs above.

See also Section 3.6.2, Operational States starting on Page 24.

3.8DATUM Support

The receiver has the ability to provide its position in one of the 62 predefined datums. The list of the supported datum and details on Message ID# 88, Select/Define Datum to Use are provided in the SUPERSTAR II Firmware Reference Manual. The receiver can also support two user-defined datums. You must define them, prior to their use, using Message ID# 88. Afterwards, the desired datum, whether it is user-defined or predefined, can be selected using the above message.

26

SMART ANTENNA User Manual Rev 6

Page 26
Image 26
Novatel user manual 3.7Built-InStatus Tests, 3.8DATUM Support, Chapter, Operation, SMART ANTENNA User Manual Rev