Series/Parallel location

Three-Phase location

4.Move the plug-in jumper from the series/parallel location to the three-phase location.

5.Replace the PCB and bottom cover, the snap on wiring cover, and all CAT5e cables..

For three-phase stacking using a HUB 10, follow the same disassembly and assembly instructions as for a HUB 4, but note that the jumper is in a different location as shown below.

HUB 10 PCB

Plug-in jumper

Jumper in series/ parallel location

Jumper in three-phase location

10

Page 11
Image 11
Outback Power Systems HUB4, MATE_B, HUB10, MATE2 user manual HUB 10 PCB