Series/Parallel location |
4.Move the
5.Replace the PCB and bottom cover, the snap on wiring cover, and all CAT5e cables..
For
HUB 10 PCB
Jumper in series/ parallel location
Jumper in
10
Series/Parallel location |
4.Move the
5.Replace the PCB and bottom cover, the snap on wiring cover, and all CAT5e cables..
For
Jumper in series/ parallel location
Jumper in
10