79

 

48

 

93

 

36 3/8 X 1-3/4”

FIGURE 34

5

 

STEP 34

Assemble one 3-1/2” PULLEY (79) around the PEC DEC CABLE (93) and to the PULLEY BRACKET (5) using one 3/8 X 1-3/4” BOLT (36) and one 3/8” LOCKNUT (48) as shown in FIGURE 34.

21

 

93

24

 

FIGURE 35

STEP 35

Slide the ends of the PEC DEC CABLE (93) into the bushings on the PEC CAMS (24) as shown on FIGURE 35.

Lay the PEC DEC CABLE (93) over the pulleys and under the cable retaining clips in the CENTER PULLEY BRACKET (21) as shown in FIGURE 35. (NOTE: The bolt holding pulley and cable retaining clips may need to be loosened to align cable retaining clips with cable.)

24

Page 24
Image 24
ParaBody 400101 manual 36 3/8 X 1-3/4