| 42 |
| 92 |
| 98 |
| 91 |
| 84 3/8 X 2” |
FIGURE 37 | 29 |
STEP 37
•Assemble one
26 |
|
98 | 24 |
98 | |
PEC |
|
CABLE |
|
| FIGURE 38 |
STEP 38 |
|
•Slide the ends of the PEC DEC CABLE (98) into the bushings on the PEC CAMS (24) as shown on FIGURE 38.
•Lay the PEC DEC CABLE (98) over the pulleys and under the cable retaining clips in the CENTER PULLEY BRACKET (26) as shown in FIGURE 38. (NOTE: Securely tighten the pulley connections in the CENTER PULLEY BRACKET (26). The cable retaining clips should be at approximately a 45° angle.)
| 1/2 |
| 1/2 |
| 1/2 |
| 1/2 |
| 1/2 |
|
| 1/2 |
0 | 1 | 2 | 3 | 4 | 5 | 6 |
33