42

 

92

 

98

 

91

 

84 3/8 X 2”

FIGURE 37

29

STEP 37

Assemble one 3-1/2” PULLEY (42) around the PEC DEC CABLE (98) and to the PULLEY BRACKET (29) using one 3/8 X 2” BOLT (84), two 3/8” WASHERS (91) and one 3/8” LOCKNUT (92) as shown in FIGURE 37.

26

 

98

24

98

PEC

 

CABLE

 

 

FIGURE 38

STEP 38

 

Slide the ends of the PEC DEC CABLE (98) into the bushings on the PEC CAMS (24) as shown on FIGURE 38.

Lay the PEC DEC CABLE (98) over the pulleys and under the cable retaining clips in the CENTER PULLEY BRACKET (26) as shown in FIGURE 38. (NOTE: Securely tighten the pulley connections in the CENTER PULLEY BRACKET (26). The cable retaining clips should be at approximately a 45° angle.)

 

1/2

 

1/2

 

1/2

 

1/2

 

1/2

 

 

1/2

0

1

2

3

4

5

6

33

Page 33
Image 33
ParaBody 425103 manual PEC Cable