FIGURE 39

92

25

 

 

 

 

 

 

103 AB CABLE

 

42

 

91

 

 

 

SEE DETAIL 39

 

49

 

 

 

 

 

 

3/8 X 2-3/4”

85

 

 

 

DETAIL 39

STEP 39

Securely assemble the ball end of the AB CABLE (103) and one 3-1/2” PULLEY (42) to the FRONT UPRIGHT (25) using two 3/ 8 X 2-3/4” BOLTS (85), two 3/8” FLANGE SPACERS (49), two 3/8” WASHERS (91), and two 3/8” LOCKNUTS (92). (NOTE: The

AB CABLE (103) should be routed underneath the retaining bolt as shown in DETAIL 39.)

FIGURE 40

STEP 40

 

• Run the AB CABLE (103) through the

 

floating pulley assembly, then screw the

29

threaded end of AB CABLE (103)

103

approximately 3/4” into the end of the

PULLEY BRACKET (29) and tighten jam

 

 

nut securely as shown in FIGURE 40.

FLOATING

IMPORTANT! Make sure the cables are

PULLEY

running in the grooves of all pulleys.

 

34

 

Page 34
Image 34
ParaBody 425103 manual Detail