FIGURE 39 | 92 | 25 |
|
|
|
| |
|
| 103 AB CABLE | |
| 42 |
| 91 |
|
|
| |
SEE DETAIL 39 |
| 49 |
|
|
|
| |
|
| 3/8 X | 85 |
|
|
| DETAIL 39 |
STEP 39
•Securely assemble the ball end of the AB CABLE (103) and one
AB CABLE (103) should be routed underneath the retaining bolt as shown in DETAIL 39.)
FIGURE 40 | STEP 40 | |
| • Run the AB CABLE (103) through the | |
| floating pulley assembly, then screw the | |
29 | threaded end of AB CABLE (103) | |
103 | approximately 3/4” into the end of the | |
PULLEY BRACKET (29) and tighten jam | ||
| ||
| nut securely as shown in FIGURE 40. | |
FLOATING | IMPORTANT! Make sure the cables are | |
PULLEY | ||
running in the grooves of all pulleys. | ||
| ||
34 |
|