6

 

 

 

 

77

 

 

 

24

 

 

 

76

90 1/2 X 3-1/2”

 

 

20

14

 

 

76

 

19

51

93

95 LOW HEIGHT NUT

 

 

 

 

 

 

 

95 LOW HEIGHT NUT

 

 

 

 

FIGURE 28

STEP 28

Assemble one 3/4” SLEEVE BEARING (77), one PEC CAM (24), two 3/4” FLANGE BEARINGS (76), one 1/2” WASHER (93), and one 1/2” LOW HEIGHT LOCK NUT (95), and a LEFT (19) or RIGHT PEC ARM (20) to each threaded shaft on the BEARING HOUSING (6). See FIGURE 28.

Securely assemble two 3/8” SPRING PIN ASSEMBLIES (51) to the spring pin barrels of the PEC ARMS (19 & 20). See FIGURE 28.

SECURELY assemble one TOMALOCK HANDLE (14) to each PEC ARM (19 & 20) using one 1/2 X 3-1/2” BOLT (90) and one 1/2” LOW HEIGHT LOCK NUT (95) for each PEC ARM. See FIGURE 28.

24

Page 24
Image 24
ParaBody 425103 manual 90 1/2 X 3-1/2