Manuals
/
PB Heat
/
Household Appliance
/
Boiler
PB Heat
manual Gas Boilers, Installation Operation & Maintenance Manual, Series DE
Models:
DE
1
1
43
43
Download
43 pages
63.1 Kb
1
2
3
4
5
6
7
8
<
>
Troubleshooting
Install
Repair Parts
2 Wiring and Connection Diagram
Dimension
Maintenance
A. Wiring
Problem
1 Gas Valve, Manifold and Burner Assembly - Intermittent Ignition
Start-Upprocedures
Page 1
Image 1
Series
DE
Gas
Boilers
Installation,
Operation &
Maintenance
Manual
Page 2
Page 1
Image 1
Page 2
Contents
Gas Boilers
Installation Operation & Maintenance Manual
Series DE
TABLE OF CONTENTS
TABLE OF CONTENTS
USING THIS MANUAL
USING THIS MANUAL
DANGER
A.INSTALLATION SEQUENCE
PREINSTALLATION
1. PREINSTALLATION
A.ACCESSIBILITY CLEARANCES
DANGER
Figure 1.3 Air Openings - All Air Directly from
PREINSTALLATION
where
PREINSTALLATION
D.INSTALLATION SURVEY
PREINSTALLATION
E.PLANNING THE LAYOUT
BOILER SET-UP
2.BOILER SET-UP
WATER PIPING AND CONTROLS
3. WATER PIPING AND CONTROLS
A.BOILER SUPPLY AND RETURN
Figure 3.3 Safety Relief Valve Hook-Up
B.SAFETY RELIEF VALVE
Installation with Air Elimination in
WATER PIPING AND CONTROLS
C.PIPING FOR ZONED SYSTEMS
WATER PIPING AND CONTROLS
Figure 3.5 Zone Piping with Zone Valves
Figure 3.6 Zone Piping with Circulators
D.EXPANSION TANK
WATER PIPING AND CONTROLS
E.INDIRECT-FIREDWATER HEATER
F.FREEZE PROTECTION
VENTING
4. VENTING
A.GENERAL
B.CHIMNEY VENTING
Table 4.2. Equivalent Vent Length
VENTING
Figure 4.3 Vent Pipe Adapters
VENTING
D. DIRECT EXHAUST VERTICAL VENTING
VENTING
Figure 4.4 Direct Exhaust Sidewall Venting
E.BOILER REMOVAL FROM COMMON VENTING SYSTEM
VENTING
Figure 4.5 Direct Exhaust Vertical Venting
GAS PIPING
5.GAS PIPING
Natural Gas
GAS PIPING
LP Gas
Table 5.3 Pipe Capacity
ELECTRICAL
6. ELECTRICAL
A. WIRING
B.ZONED SYSTEM WIRING
ELECTRICAL
Figure 6.2 Wiring and Connection Diagram
D.SEQUENCE OF OPERATION
Figure 6.3 Ignition System Operating Sequence
ELECTRICAL
Figure 6.5 Zone Wiring with Circulators
Figure 6.4 Zone Wiring with Zone Valves
ELECTRICAL
START-UPPROCEDURES
7. START-UPPROCEDURES
A.COMPLETING THE INSTALLATION
Figure 7.1 Gas Valve, Manifold and Burner Assembly - Intermittent Ignition
START-UPPROCEDURES
START-UPPROCEDURES
FOR YOUR SAFETY READ BEFORE LIGHTING
OPERATING INSTRUCTIONS
TO TURN OFF GAS TO APPLIANCE
C.ADJUSTMENT OF GAS PRESSURE REGULATOR
START-UPPROCEDURES
B.CONTROL DESCRIPTIONS
D.CHECKING BURNER INPUT
E.CHECK-OUTPROCEDURE
START-UPPROCEDURES
Time that
3.Low Water Cut-Offif used - Consult the manufacturer’s instructions for the low water cut-offoperational check procedure
START-UPPROCEDURES
TROUBLESHOOTING
8. TROUBLESHOOTING
B.TROUBLESHOOTING GUIDES
DANGER
SEE TABLE
TROUBLESHOOTING
Problem
TROUBLESHOOTING
1. See Figure
1. See Figure
TROUBLESHOOTING
MAINTENANCE
9. MAINTENANCE
A.GENERAL
MAINTENANCE
B.DAILY WITH BOILER IN USE
C.WEEKLY WITH BOILER IN USE
The boiler is at room temperature
MAINTENANCE
DANGER
E.ANNUALLY BEFORE START OF HEATING SEASON
BOILER DIMENSIONS & RATINGS
10. BOILER DIMENSIONS & RATINGS
SERIES DE BOILER RATINGS
REPAIR PARTS
11. REPAIR PARTS
REPAIR PARTS SERIES DE GAS BOILER
Figure 11.2 Base/Burners/Manifold
REPAIR PARTS
Item No
REPAIR PARTS
Description
Part Selection Information
Page
Page
TO THE INSTALLER
Installation Operation & Maintenance Manual
Qualified Service Agency
Series DE