Manuals
/
PB Heat
/
Household Appliance
/
Boiler
PB Heat
DE manual
Models:
DE
1
42
43
43
Download
43 pages
63.1 Kb
36
37
38
39
40
41
42
43
<
>
Troubleshooting
Install
Repair Parts
Dimension
Maintenance
A. Wiring
Problem
Start-Upprocedures
Safety
Qualified Service Agency
Page 42
Image 42
NOTES
40
Page 41
Page 43
Page 42
Image 42
Page 41
Page 43
Contents
Installation Operation & Maintenance Manual
Gas Boilers
Series DE
TABLE OF CONTENTS
TABLE OF CONTENTS
DANGER
USING THIS MANUAL
USING THIS MANUAL
A.INSTALLATION SEQUENCE
A.ACCESSIBILITY CLEARANCES
1. PREINSTALLATION
PREINSTALLATION
DANGER
PREINSTALLATION
Figure 1.3 Air Openings - All Air Directly from
PREINSTALLATION
where
PREINSTALLATION
D.INSTALLATION SURVEY
E.PLANNING THE LAYOUT
2.BOILER SET-UP
BOILER SET-UP
3. WATER PIPING AND CONTROLS
WATER PIPING AND CONTROLS
A.BOILER SUPPLY AND RETURN
Installation with Air Elimination in
B.SAFETY RELIEF VALVE
Figure 3.3 Safety Relief Valve Hook-Up
WATER PIPING AND CONTROLS
Figure 3.5 Zone Piping with Zone Valves
WATER PIPING AND CONTROLS
C.PIPING FOR ZONED SYSTEMS
Figure 3.6 Zone Piping with Circulators
E.INDIRECT-FIREDWATER HEATER
WATER PIPING AND CONTROLS
D.EXPANSION TANK
F.FREEZE PROTECTION
A.GENERAL
4. VENTING
VENTING
B.CHIMNEY VENTING
VENTING
Table 4.2. Equivalent Vent Length
VENTING
Figure 4.3 Vent Pipe Adapters
VENTING
D. DIRECT EXHAUST VERTICAL VENTING
Figure 4.4 Direct Exhaust Sidewall Venting
VENTING
E.BOILER REMOVAL FROM COMMON VENTING SYSTEM
Figure 4.5 Direct Exhaust Vertical Venting
5.GAS PIPING
GAS PIPING
LP Gas
GAS PIPING
Natural Gas
Table 5.3 Pipe Capacity
A. WIRING
6. ELECTRICAL
ELECTRICAL
B.ZONED SYSTEM WIRING
Figure 6.2 Wiring and Connection Diagram
ELECTRICAL
D.SEQUENCE OF OPERATION
ELECTRICAL
Figure 6.3 Ignition System Operating Sequence
Figure 6.4 Zone Wiring with Zone Valves
Figure 6.5 Zone Wiring with Circulators
ELECTRICAL
7. START-UPPROCEDURES
START-UPPROCEDURES
A.COMPLETING THE INSTALLATION
START-UPPROCEDURES
Figure 7.1 Gas Valve, Manifold and Burner Assembly - Intermittent Ignition
OPERATING INSTRUCTIONS
FOR YOUR SAFETY READ BEFORE LIGHTING
START-UPPROCEDURES
TO TURN OFF GAS TO APPLIANCE
B.CONTROL DESCRIPTIONS
START-UPPROCEDURES
C.ADJUSTMENT OF GAS PRESSURE REGULATOR
D.CHECKING BURNER INPUT
START-UPPROCEDURES
E.CHECK-OUTPROCEDURE
Time that
START-UPPROCEDURES
3.Low Water Cut-Offif used - Consult the manufacturer’s instructions for the low water cut-offoperational check procedure
B.TROUBLESHOOTING GUIDES
8. TROUBLESHOOTING
TROUBLESHOOTING
DANGER
TROUBLESHOOTING
SEE TABLE
1. See Figure
TROUBLESHOOTING
Problem
1. See Figure
TROUBLESHOOTING
9. MAINTENANCE
MAINTENANCE
B.DAILY WITH BOILER IN USE
MAINTENANCE
A.GENERAL
C.WEEKLY WITH BOILER IN USE
E.ANNUALLY BEFORE START OF HEATING SEASON
MAINTENANCE
DANGER
Water, gas and electricity are off
10. BOILER DIMENSIONS & RATINGS
BOILER DIMENSIONS & RATINGS
SERIES DE BOILER RATINGS
11. REPAIR PARTS
REPAIR PARTS
REPAIR PARTS SERIES DE GAS BOILER
REPAIR PARTS
Figure 11.2 Base/Burners/Manifold
Description
REPAIR PARTS
Item No
Part Selection Information
Page
Page
Qualified Service Agency
Installation Operation & Maintenance Manual
TO THE INSTALLER
Series DE