Pelco NET5308T-EXP manual Assembling a Support Rail Repeat for the other rail set

Models: NET5308T-EXP

1 32
Download 32 pages 44.68 Kb
Page 13
Image 13

(3) SCREWS, 8-32 X 0.375 PHILLIPS TRUSS HEAD

Figure 7. Assembling a Support Rail

3.Repeat step 2 for the other rail set.

4.If you are installing the unit into a square-hole rack: Insert 10 cage nuts into the square-hole rack as shown in Figure 8. Align the top and bottom cage nuts on the front racks with the top and bottom cage nuts on the rear racks.

CAGE NUT

CAGE NUT

FRONT-MOUNT RAIL

REAR-MOUNT RAIL

Figure 8. Inserting Cage Nuts

5.Attach one support rail assembly to the equipment rack in the desired location (refer to Figure 9):

NOTE: The support rail assemblies are identical and may be used on either the right or left side of the rack.

a.Position the ear of the front-mount rail against the front of the equipment rack. Align the top and bottom holes in the ear of the rail with the threaded holes (or cage nuts) in the rack.

b.Using two 10-32 x 0.5-inch Phillips flat head screws, attach the ear of the rail to the front of the rack. Insert the screws from the outside of the rack, pointing toward the back of the rack.

c.Adjust the rails to the correct depth of the equipment rack by sliding the rear-mount rail to the back of the equipment rack.

d.Position the ear of the rear-mount rail against the rear exterior of the equipment rack. Align the top and bottom holes in the ear of the rail section with the threaded holes (or cage nuts) in the equipment rack.

e.Using two 10-32 x 0.5-inch Phillips pan head screws, attach the ear of the rail to the rear of the rack. Insert the screws from the outside of the rack, pointing toward the front of the rack.

C2655M-A (10/08)

13

Page 13
Image 13
Pelco NET5308T-EXP manual Assembling a Support Rail Repeat for the other rail set