Pentair 200 installation manual Volts AC

Models: 200

1 72
Download 72 pages 41.83 Kb
Page 19
Image 19

Section III. Installation

19

 

 

 

WIRING SCHEMATIC FOR ALL DUAL VOLTAGE BLOWERS

120 VOLTS AC

240 VOLTS AC

WHITE

LINE # 1

WHITE

LINE # 1

YELLOW

JOINED

YELLOW

CAP OFF

ORANGE

ORANGE

 

 

JOINED

 

 

 

 

 

BLACK

LINE # 2

BLACK

 

 

 

 

 

LINE # 2

PURPLE

PURPLE

 

BROWN

 

BROWN

 

=

CAPACITOR

=

CAPACITOR

BROWN

 

BROWN

 

NOTE FOR TEST OF THE BLOWER:

1.In reference to the above terms, "CAP OFF" means to no connection.

2.The term "JOINED" means the two wires are connected together and no external connection.

Figure 18.

Rev. G • Rév. G 5-27-04

P/N • Réf. 472090

Page 19
Image 19
Pentair 200 installation manual Volts AC