![](/images/new-backgrounds/1175828/17582837x1.webp)
Section III. Installation | 19 | |
|
|
|
WIRING SCHEMATIC FOR ALL DUAL VOLTAGE BLOWERS
120 VOLTS AC | 240 VOLTS AC |
WHITE | LINE # 1 | WHITE | LINE # 1 | |||
YELLOW | JOINED | YELLOW | CAP OFF | |||
ORANGE | ORANGE |
| ||||
| JOINED | |||||
|
|
|
|
| ||
BLACK | LINE # 2 | BLACK |
| |||
|
|
|
| LINE # 2 | ||
PURPLE | PURPLE | |||||
| ||||||
BROWN |
| BROWN |
| |||
= | CAPACITOR | = | CAPACITOR | |||
BROWN |
| BROWN |
|
NOTE FOR TEST OF THE BLOWER:
1.In reference to the above terms, "CAP OFF" means to no connection.
2.The term "JOINED" means the two wires are connected together and no external connection.
Figure 18.
Rev. G • Rév. G | P/N • Réf. 472090 |