26
[Leveling]
Rotate instrument horizontally and make two
Leveling screws arbitrarily chosen parallel to the
display.
Turn on the Electronic vial function by pushing
the Laser key.
Put the bubble of the Circular vial in the center
of the circle when the display shows “TILT OVER”.
Turn two Leveling screws arbitrarily chosen in an
opposite direction mutually and put the vial of
the horizontal Electronic vial in the center.
(Figure A)
Put the bubble of the lengthwise Electronic vial
in the center by operating the Leveling screw of
one remainder.(Figure B)
The procedures are different according to the
state of the Automatic inclination correction as
following.
[When using the Automatic inclination correction by 2 axes]
Please read procedure because the horizontal angle and the perpendicular angle error
by a perpendicular axis are automatically corrected.
[When using the Automatic inclination correction by 1 axis]
The instrument is horizontally rotated by 180°after the bubble of the Electronic vial is
adjusted on the center at a Left circle position side and confirm that the bubble of the vial
is at the center at the right circle position.
[When using without Automatic inclination correction]
Confirm the bubble is at the center even if the instrument is rotated by each 90°.
Confirm whether the plummet is on the ground mark.When you confirm it is not on
the mark,loosen the center screw and move the instrument over the ground mark
correctly and fix the instrument by a center screw.Repeat from to 61
6
6
5
4
3
2
1
Leveling screw
Leveling screw