Perle Systems S-10G-XTXH, S-10G-XTSH manual Installation, S-10G-STS

Models: S-10G-STS S-10G-XTXH S-10G-XTS S-10G-XTX S-10G-XTSH

1 16
Download 16 pages 41.41 Kb
Page 4
Image 4
Installation

Installation

The default switch setting (all switches in the UP position) will work for most installations. These are the steps required to configure the Perle S-10G standalone media converter:

1.Set the DIP switch settings.(optional)

2.Connect the grounding lug. (optional)

3.Connect the power cord strain relief clip. (optional)

4.Insert the fiber or copper modules.

5.Connect the fiber or copper cables.

6.Using the Perle supplied power adapter, plug the power cord into the power cord connector at the rear of the chassis.

7.Plug the other end of the power adapter into an appropriate power outlet.

Note: The S-10G Chassis should always be grounded for safe and proper operation. See Grounding the S10-G Chassis

S-10G-STS

P/N 5500325-10

Page 4
Image 4
Perle Systems S-10G-XTXH, S-10G-XTSH manual Installation, S-10G-STS