Adjustment
13.05.14 Thread check spring, without subclass -900/56
Requirement
The movement of thread check spring 5 must be finished when the needle pointe enters the material (=spring stroke of about 7 mm).
7 mm
5
13
2
4
Fig. 11 - 14
●Adjust stop 1 (screw 2) according to Requirement.
●To adjust the pressure of the spring, turn screw 3 (screw 4).
For technical reasons the length of the thread check spring stroke may vary upwards or downwards a little.
13 - 16