7.2.11.Setting the PAD PCB

1.Fix the PAD PCB using the 2 Screws. <N29>

2.Attach the TP PCB Screw Sheet.

3.Connect the Cable to the Connector. (CN802)

4.Connect the Cable to the Connector (CN801) and attach the Tape.

TP PCB Screw Sheet

Tape <N29>

Screws <N29>: DRQT26+E3FNL

<N29>

Connector (CN801)

Pad PCB

Connector (CN802)

Assembly of PAD PCB

*Notes:

1.Apply the load when attaching the parts. 20N to 30N (2 to 3Kgf)/cm2

Order of fixing

Screw Screw

Insert the boss at an angle to put here close to the Cabinet side.

CAUTION

S1:Insulation S2:Pinching Cables S3:Sharp Edge

S4:Part No. Check S5:Others

 

 

Cable Hold Sheet is installed

Process the SP cable between the bosses.

FFC Insertion

PCB Pad is set

Safety Working

Attach the Touch Pad

S1

PCB Screw Sheet

Safety Working

Attach the Touch Pad INS Sheet

Avoid running over the boss and the rib.

0

2

 

Safety Working

 

S2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Do not insert the Connector at an angle.

S1

 

 

 

 

 

 

 

 

 

 

 

 

0

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FFC Insertion

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Attach the Touch

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tighten of

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pad FFC Fix Tape

 

 

 

 

 

 

 

Attach the Tape

 

 

 

 

 

 

 

 

Screw

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fit to the Cabinet line.

 

 

 

 

 

 

 

 

 

 

 

Tighten of

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7

11

 

 

 

 

Screw

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Safety Working

S2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

S2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Safety Working

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Attach the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cable Sheet

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Attach the Tape

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fit to the Cabinet line.

 

 

 

 

 

7 11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Process the surplus of FFC to the back.

PCB Pad

LED PCB

Process the wire targeting the boss.

CN Connection After connecting, add the kapton tape.

7-24

Page 45
Image 45
Philips CF-30FTSAZAM service manual Setting the PAD PCB, Assembly of PAD PCB