7.2.12. Setting the FPC HDD BAT

1.Fix the FPC HDD BAT using the Screw. <N16>

2.Connect the 2 Cables to the 2 Connectors. (CN7,CN8)

3.Connect the Cable to the Connector. (CN800)

4.Attach the PAD Protect Sheet.

5.Connect the Cable to the Connector. (CN9)

6.Attach the Tape.

7.Connect the 2 Cables to the 2 Connectors. (CN10,CN26)

8.Attach the Tape.

9.Attach the Antenna Cable Sheet on the Main PCB.

10.Fix the HDD FPC BAT using the 4 Screws. <N29> No1 to No4

Note:

Tighten the Screws in the numbered order (No1 to No4).

Screw <N16>: DRQT26+E5FKL

Screw <N29>: DRQT26+E3FNL

to Connector (CN8) to Connector (CN7)

FPC HDD BAT

<N16>

 

 

No.1

 

 

 

<N29>

No.4

 

 

No.2

 

to Connector (CN800)

<N29>

 

<N29>

 

Antenna Cable Sheet

No.3

 

 

 

 

 

<N29>

 

 

 

HDD Cable Cover

 

Tape

to Connector (CN26)

 

Connector(CN10)

 

 

Pad Protect

 

 

 

 

Connector(CN26)

Sheet

 

 

Connector

 

 

 

(CN8)

 

 

 

 

 

 

Tape

Connector

 

 

 

(CN7)

 

 

Connector(CN9)

 

 

 

Pad PCB

 

 

Connector (CN800)

 

 

 

Preparation of HDD FPC ASSY

Order of fixing

ScrewScrew

Fold mountain based on the white line.

Not to forget folding

Tighten of

Tighten of

Screw

Screw

Battery Guide

is setBattery Connector PIN is set

Not to forget folding

Battery Connector PIN

Cushion is set

7-25

Page 46
Image 46
Philips CF-30FTSAZAM service manual Setting the FPC HDD BAT, Preparation of HDD FPC Assy