Pioneer PDP 503CMX, PDP 433CMX How to Route Cables, To attach the speed clamps to the main unit

Models: PDP 503CMX PDP 433CMX

1 43
Download 43 pages 60.38 Kb
Page 22
Image 22
How to Route Cables

English

Installation and Connections

How to Route Cables

Speed clamps and bead bands are included with this unit for bunching cables together. Once components are connected, follow the following steps to route cables.

* As viewed from the rear of the display.

1

2

and Connections

1Organize cables together using the provided speed clamps.

Insert 1 into an appropriate hole on the rear of the unit, then snap 2 into the back of 1 to fix the clamp.

Speed clamps are designed to be difficult to undo once in place. Please attach carefully.

2Bunch separated cables together and secure them with the provided bead bands.

Note

Cables can be routed to the right or left.

Installation

To attach the speed clamps to the main unit

Connect the speed clamps using the 4 holes marked with • below, depending on the situation.

Illustration depicts PDP-503CMX model.

To remove speed clamps

Using pliers, twist the clamp 90° and pull it outward. In some cases the clamp may have deteriorated over time and may be damaged when removed.

16

En

Page 22
Image 22
Pioneer PDP 503CMX, PDP 433CMX How to Route Cables, To attach the speed clamps to the main unit, To remove speed clamps