Admin

Privilege

Figure 6-2: ATM Status Screen

PPP Status

The PPP Status page shows the status of PPP for each PVC. Connect and Dis- connect allows you to manually connect/disconnect the PPP connection for specified PVC.

If current connection is disconnected after the Disconnect Timeout, you will have to go to this page, choose the correct PVC and Connect option, and then click Execute to restart a new PPP secession.

Figure 6-3:PPP Status Screen

39

Page 45
Image 45
Planet Technology ADE-4000 user manual PPP Status, ATM Status Screen