Manuals
/
Brands
/
Computer Equipment
/
Switch
/
Planet Technology
/
Computer Equipment
/
Switch
Planet Technology
FGSW-1828PS, FNSW-1608PS manual
1
1
72
72
Download
72 pages, 6.63 Mb
User's Manual
FNSW-1608PS
FGSW-1828PS
16-Port
10/100Mbps Web Smart PoE Switch
- 1 -
Contents
Page
Trademarks
Disclaimer
FCC Warning
CE Mark Warning
WEEE Warning
TABLE OF CONTENTS
APPENDIX A NETWORKING CONNECTION
1.1 Checklist
1.2 About the Switch
1.3Features
1.4Specification
PoE Power Output
Power Pin Assignment
Power Budget
2.1 Front Panel
2.1.1 LED indicators
System
Per 10/100Mbps port
Per 10/100/1000Base-Tport / SFP interfaces (FGSW-1828PSonly)
2.2 Rear Panel
Power Notice:
2.3 Hardware Installation
2.3.1 Desktop Installation
2.3.2 Rack Mounting
Caution:
3.2.1 Web Management
3.2.2 PLANET Smart Discovery Utility
3.3Logging on to the FNSW-1608PS / FGSW-1828PS
4.1Login in to the Switch
Page
4-2System
Object
Description
4.2.1 System Information
4.2.2 IP Configuration
4.2.3 Password Setting
4.2.4 Alert Trap
4.2.5 Factory Default
4.2.6 Firmware Update
Page
Page
4.2.7 Reboot
4-3Port Management
4.3.1 Port Configuration
Page
4.3.2 Port Mirroring
4.3.3 Bandwidth Control
4.3.4 Broadcast Storm Control
4.3.5 Port Statistics
4-4VLAN Setting
Page
Page
4.4.1 802.1Q VLAN
Page
802.1Q VLAN Setting example:
Two separate 802.1Q VLAN scenario
Untagged packet entering VLAN
Tagged packet entering VLAN
#Notice:
Setup steps
1. Create VLAN Group:
Page
3.Assign PVID for each port:
4.Enable VLAN Tag for specific ports
Two separate 802.1Q VLAN with overlapping area scenario
Page
Page
4.4.2 Port Based VLAN
Port Based VLAN Setting example:
VLAN scenario
4.4.3 MTU VLAN
4-5Trunk Setting
Page
4-6QoS Setting
4.6.1 Priority Mode
4.6.2 Class of Service Configuration
4.6.3 TCP / UDP Port Based QoS
Page
4-7Security Filter
4.7.1 MAC Address Filter
4.7.2 TCP / UDP Filter
Page
4-8Misc Operation
4-9POE Setting
Power Management:
Page
4-10Logout
5.1 Address Table
5.2 Learning
5.3 Forwarding & Filtering
5.4 Store-and-Forward
5.5 Auto-Negotiation
Mid-Span
End-Span
PoE System Architecture
How Power is Transferred Through the Cable
Page
Stages of powering up a PoE link
Volts speci
Volts man
Stage
Action
7.3 Start-up
7.4 Operation
7.5 Power Disconnection Scenarios
DC Disconnect
AC Disconnect
The Link LED is not lit
Some stations cannot talk to other stations located on the other port
Performance is bad
100Base-TXport link LED is lit, but the traffic is irregular
Why the Switch doesn’t connect to the network
A.1 Switch‘s RJ-45Pin Assignments
A.2 RJ-45cable pin assignment
Straight Cable
SIDE
SIDE2
Figure A-1: Straight-Throughand Crossover Cable
2080-A31120-006
Taiwan
10th, JUNE