Installing the SpectraLink 8000 SVP Server

2

Installing the SpectraLink 8000 SVP Server

As shown in the system diagram, the SVP Server is connected to the Ethernet switch. The specifications covered here allow for great flexibility in physical placement of the components within stated guidelines.

See the Configuration and Administration document for your vendor’s IP system for information on LAN requirements, network infrastructure and IP addressing.

This unit must be installed by a service person familiar with the installation of electronic equipment.

Do not power up the unit before it has been properly grounded to a protective earth. See Grounding Instructions below.

Required Materials

The following equipment must be provided by the customer.

†Power Outlet – AC adapter provided by Polycom.

†Backboard space – the SVP Server is designed to be wall- mounted to 3/4" plywood securely screwed to the wall.

†Screws – required to mount the SVP Server to the wall. Four #8 3/4" panhead wood screws (or similar device) are required.

†Cat. 5 Cable RJ-45 connector at the SVP Server. Connection to Ethernet switch.

†Grounding materials per section below Grounding Instructions.