6
Step 3. Mount the RouterTo mount the iSR6200 router in the rack, follow the instructions (QLogic 6200 Storage Router Rack Mounting Guide)
provided in the rack mount kit.
Step 4. Insert Additional Blade into Router (as needed)If you have purchased an additional blade (B10), insert it into the iSR6200 router as follows:
1. Move the ejector latch handle to a position horizontal to the base.
2. Slide the blade into an open chassis slot.
3. When the blade is completely inserted, raise the ejector latch handle to snap the blade into place.
Step 5. Install the SFP TransceiversAn SFP transceiver is required for each router port that will be connected to a Fibre Channel device or switch. SFPs are
included in the package. If you prefer to use SFP transceivers other than the ones provided, purchase one of the QLogic
recommended transceivers listed in Table 3.
To install an SFP transceiver, insert the transceiver into the router port, and then press gently until it snaps in place. The
transceiver will fit only one way. If the transceiver does not install under gentle pressure, flip it over and try again.
iSCSI port 3 IP address, subnet mask,
and gateway for the optional (FC3, GE-3,
or 10GE-3) port
IP address of the iSNS server for iSCSI
port 3 (if iSNS will be enabled)
iSCSI port 4 IP address, subnet mask,
and gateway for the optional (FC4, GE-4,
or 10GE-4) port
IP address of the iSNS server for iSCSI
port 4 (if iSNS will be enabled)
Table 3. Recommended Replacement Transceivers
8Gb Transceivers 10Gb Transceivers
Manufacturer Part Number Manufacturer Part Number
Finisar®FTLF8528P2BCV-QL Finisar FTLX8571D3BCL
JDS Uniphase®PLRXPL-VC-SH4-22-N-Q
PLRXPL-VC-SH4-23-N-QL
JDS Uniphase PLRXPL-SC-S43-22-N
Table 2. Worksheet for Router Blade 2 (right) Parameters (Continued)