Quadra-Fire QVI-30FB 3Installing the Insert, Installing the Vent System, Vent System Approvals

Models: QVI-30FB

1 25
Download 25 pages 38.78 Kb
Page 12
Image 12
3Installing the Insert

3Installing the Insert

Step 1. Installing the Vent System

Vent System Installation Precautions

Before starting installation of vent kits, the installer should read these instructions and the Vent Kit Instructions to ensure that a proper vent installation is completed.

Consult your local building codes before beginning the installation.

!WARNING: THIS GAS INSERT AND VENT AS- SEMBLY MUST BE VENTED DIRECTLY TO THE

OUTSIDE AND MUST NEVER BE ATTACHED TO A CHIMNEY SERVING A SEPARATE SOLID FUEL BURNING APPLIANCE. EACH GAS APPLIANCE MUST USE A SEPARATE VENT SYSTEM. COMMON VENT SYSTEMS ARE PROHIBITED.

Vent System Approvals

Fireplace QVI30-FB is approved with vent termination kits LINK-DV-30, LINK-DV-30B, LINK-DV4-30 and LINK-DV4-30B as shown in Figures 4 & 5. Approved vent system termina- tions are labeled for identification. 3-inch diameter listed flexible aluminum and stainless steel gas vent is used for both the incoming combustion air and exhaust vent pipes.

NO OTHER VENTING SYSTEMS OR COMPONENTS MAY BE USED. Detailed installation instructions are included with each vent termination kit and should be used in con- junction with this manual.

Horizontal Venting

The vent system on this model CANNOT be terminated horizontally.

Vertical Venting

The vent pipes MUST be connected to the proper collars on the unit AND the exhaust vent pipe MUST be connected to the termination cap or the unit will not operate. The com- bustion air vent pipe CAN be connected to the termination cap (LINK -DV30, LINK -DV30B) or it can terminate inside the chimney (LINK-DV4-30, LINK-DV4-30B). The bottom opening of the chimney must be sealed around the vent pipes if the combustion air vent is NOT connected to the termination cap. See Figures 4 and 5.

NOTE: The minimum vertical rise (exhaust vent) is 14 feet and the maximum vertical rise is 50 feet. These dimensions are measured from the starting collars of the unit to the end of the last section of vent pipe. See dimension V in Figure 4.

A vertical vent termination system installed on this model will require one (1) length of 3” stainless steel liner, one (1) length of 3-inch flexible vent pipe for the combustion air, one (1) length of 3-inch flexible vent pipe for the exhaust air and one (1) Termination Cap.

NOTE: The damper of the existing chimney may need to be removed to allow installation of the flexible-vent pipe.

!WARNING: THIS FIREPLACE HAS BEEN CONVERTED FOR USE WITH A GAS

FIREPLACE INSERT ONLY AND CANNOT BE USED FOR BURNING WOOD OR SOLID FUELS UNLESS ALL ORIGINAL PARTS HAVE BEEN REPLACED, AND THE FIREPLACE REAPPROVED BY THE AUTHORITY HAVING JURISDICTION.

NOTE: The above label, located in the instruction package, must be affixed to the existing fireplace prior to installation.

For zero clearance factory built woodburning fireplaces, the use of kit LINK-ZC-ADPB in place of the standard square flashing will allow you to mount the adaptor and cap on class-A metal pipe.

Connecting the Vent Pipe

Install the 3” flexible vent pipe(s) down through the chimney. Secure the end of the flexible vent pipe for exhaust to the provided 3’ section of stainless steel flexible vent pipe. A 3” collar is factory installed on one end for mating the two ends of flexible pipe.

!WARNING: THE 3’ SECTION OF STAINLESS STEEL FLEXIBLE PIPE MUST BEATTACHED DI-

RECTLY TO THE EXHAUST COLLAR OF THE UNIT.

Attach either 4’ or 30’ section of intake liner to the intake collar on the collar slide-plate using 3 screws. This assembly may be removed from the unit to aid installation. Slide insert into position, while pulling intake collar assembly towards the front of the unit. Slide the gas insert into place, and position any excess flexible vent pipe back up into the chimney. This assembly will be secured in place when the pull handle can be secured into position.

12

Quadra-FireQVI-30FB2020-900 Rev. H • 9/07

Page 12
Image 12
Quadra-Fire QVI-30FB owner manual 3Installing the Insert, Installing the Vent System, Vent System Installation Precautions