Quadra-Fire QVI-30FB owner manual Before Lighting the Appliance, Double-checkfor gas leaks

Models: QVI-30FB

1 25
Download 25 pages 38.78 Kb
Page 20
Image 20
Step 9. Before Lighting the Appliance

3.Attach the low voltage wires to the ON/OFF switch lo- cated on the front of surround.

4.Attach surround assembly by securing four corners with screws provided (see Figure 14.) Reposition the fireplace if necessary. Refer to surround instructions provided with the decorative surround.

NOTE: PLACE THE THREE INSULATION PIECES INTO THE CAVITIES AT THE BACK OF THE SURROUND BE- FORE POSITIONING THE INSERT INTO THE FACTORY- BUILT OR MASONRY FIREPLACE. THIS INSULATION WILL HELP SEAL FOR COLD AIR LEAKS.

12” MAX.

MANTEL

12” MIN.

TOP OF

UNIT

Figure 15

Figure 15 shows the minimum vertical and corresponding maximum horizontal dimensions of mantels or other com- bustible projections above the gas fireplace.

Step 9. Before Lighting the Appliance

Before lighting the appliance, be sure to do the following:

Remove all paperwork from the fireplace. Review safety warnings and cautions

Read the Safety and Warning Information section at the beginning of this Installers Guide.

Double-check for gas leaks

Before lighting the appliance, double-check the unit for possible gas leaks.

Double-check vent terminations for obstructions.

Before lighting the appliance, double-check the unit for possible obstructions that could be blocking the vent ter- minations.

Double-check for faulty components

Any component that is found to be faulty MUST BE re- placed with an approved component. Tampering with the appliance components is DANGEROUS and voids all war- ranties.

A small amount of air will be in the gas supply lines. When first lighting the appliance, it will take a few minutes for the lines to purge themselves of this air. Once the purging is complete, the appliance will light and will operate normally.

Subsequent lightings of the fireplace will not require this purging of air from the gas supply lines, unless the gas valve has been turned to the OFF position, in which case the air would have to be purged.

NOTE: The fireplace should be run 3 to 4 hours on the initial start-up. Turn it off and let it cool completely. Remove and clean the glass. Replace the glass and run the fireplace for an additional 8 hours. This will help to cure the products used in the paint and logs.

During this break-in period it is recommended that some windows in the house be opened for air circulation. This will help avoid setting off smoke detectors, and help eliminate any odors associated with the fireplace’s initial burning.

20

Quadra-FireQVI-30FB2020-900 Rev. H • 9/07

Page 20
Image 20
Quadra-Fire QVI-30FB Before Lighting the Appliance, Double-checkfor gas leaks, Double-checkfor faulty components