Quantum GAS-FIRED BOILERS installation instructions

Models: GAS-FIRED BOILERS

1 68
Download 68 pages 29.18 Kb
Page 48
Image 48

d.Reinstall and connect the condensate trap, using the hose clamps to secure the various condensate lines to their fittings.

e.Follow the instructions under “NEAR BOILER PIPING” for”filling condensate trap with water”

4.Inspection of the flue connector requires the following steps (Refer to the repair parts diagram.)

a.Loosen the clamp on the draft inducer end of the 2" flexible coupling that connects the vent tee to the draft inducer. Disconnect (unplug) wiring harness from draft inducer motor and draft inducer temperature safety switch. Remove four (4) bolts that attach draft in ducer to flue connector.

b.Remove draft inducer and gasket from top of flue connector.

c.Inspect interior of flue connector. Any buildup of sediment or aluminum oxide on the inside surface must be cleaned. Position the draft inducer gasket and the draft inducer and fasten with four (4) screws. Be sure to connect ground wire from draft inducer motor to one of the four mounting screws.

d.Connect wiring harness leads to the draft inducer motor and the draft inducer tempera ture safety switch.

e.Connect the 2" flexible coupling to the draft inducer outlet.

46

Page 48
Image 48
Quantum GAS-FIRED BOILERS installation instructions