Quantum GAS-FIRED BOILERS Start-Up, Check-Outprocedures And Adjustments, Maintenance And Cleaning

Models: GAS-FIRED BOILERS

1 68
Download 68 pages 29.18 Kb
Page 4
Image 4

H. draft inducer

33

I. circulator pump

33

J. drain valve

33

K. relief valve

34

L. flame rollout safety shutoff

34

M. external condensate pump

34

START-UP

34

A. water treatment and freeze protection

34

B. filling boiler with water and purging air with diaphragm type expansion tanks

35

C. filling boiler with water and purging air with conventional closed type expansion tanks....

35

D. boiler in placing

36

I. for your safety read before operating

 

II. operating instructions

 

III. to turn off gas to appliance

 

CHECK-OUT PROCEDURES AND ADJUSTMENTS

37

A. verify proper sequence of operation

37

B. inspect venting and air intake system

38

C. inspect condensate drain

38

D. inspect system piping

38

E. test ignition system safety shutoff

38

F. test high limit control and adjust

38

G. test other safety controls

39

H. set thermostat heat

39

1. measure the gas input rate

39

J. set thermostat to desired room temperature

41

K. review all instructions

41

L. installation and check-out certificate

41

MAINTENANCE AND CLEANING

43

A. beginning of each season

43

B. daily during heating season

43

C. monthly during heating

44

D. periodically during heating

44

E. end of each heating season -annual shut down procedure

44

F. annual examination and cleaning of boiler components

44

SERVICE HINTS

47

A flow chart/detailed sequence of operation

47

B. trouble shooting

50

C. differential air pressure switch check

58

REPAIR PARTS

59

A. jacket and base

59

B. condensate drain trap assembly

61

C. block and piping assembly

62

D. mixer and air pressure switch assembly

64

E. flue adapter and exhauster assembly

66

2

Page 4
Image 4
Quantum GAS-FIRED BOILERS Start-Up, Check-Outprocedures And Adjustments, Maintenance And Cleaning, Service Hints