c.Remove air baffle from 1%z” x2" flexible coupling and clean air baffle if necessary. Refer to repair parts diagram, mixer and pressure switch assembly.

d.Confirm that manual gas valve is closed and disconnect gas line to gas valve at union. Disconnect wires to gas valve. and igniter.

e.Loosen but do not remove five (5) nuts attaching mixer assembly to boiler. Remove two (2) igniter screws and very carefully remove the igniter. Use care when removing the igniter, it is very brittle!!

f.Remove five (5) nuts and remove mixer assembly. Remove burner and mixer gasket.

g.Aluminum oxide deposits are water soluble and may be rinsed away with spraying or running water. Before rinsing, connect a ‘/z” I.D. hose to the barbed fitting on the bottom of the boiler and run the hose to a bucket or drain.

h.After rinsing, remove any remaining loosened sediment using a shop vacuum with a snorkel attachment.

iInspect burner for any foreign matter in the flame ports or inside the burner. Any for- eign matter should be removed by blowing with compressed air or vacuuming.

j.Inspect interior of mixer for any signs of sediment or aluminum oxide and clean if necessary.

k.Reinstall burner and mixer gasket and position mixer assembly over studs. Install five

(5)nuts but do not tighten. Reinstall igniter and igniter gasket and fasten with two (2) screws. Use care when installing the igniter. It is very brittle!! Tighten five (5) nuts holding mixer assembly.

l.Connect:

gas line to gas valve

condensate drain line to boiler

pressure switch hose to gas valve

air by-pass to mixer

1 1/2" x2" flexible coupling to air inlet and make sure to put air baffle back to correct position

igniter wires

gas valve wires

3.Visually inspect condensate lines leading from the boiler sections and the vent tee to the condensate trap. Refer to repair parts diagrams. Any foreign material or debris that is visible in the condensate lines needs to be cleaned out as follows: .

a.Raise condensate trap and drain condensate lines completely.

b.Once the condensate trap is emptied of water, disconnect condensate lines from the fittings on the boiler, the vent tee, and the condensate outlet.

c.Remove the condensate trap and run cold water through the condensate lines to thoroughly flush out any sediment or debris in the lines.