Raypak 0090B 0135B Contents, Receiving Equipment, General Specifications And Dimensions

Models: 0090B 0135B

1 38
Download 38 pages 58.42 Kb
Page 2
Image 2
Contents

Contents

31. RECEIVING EQUIPMENT

32. GENERAL SPECIFICATIONS AND DIMENSIONS

43. INSTALLATION PROCEDURES

4- Code Requirements

4- Mounting Base

4- Clearance Requirements

4- Combustion/Ventilation Air

5- Venting Connections

7- Vent Damper Installation

10

- Gas Supply Connections

10

- Water Connections & System Piping

14

- Electrical Wiring

22

4. SERVICING PROCECURES

22

- General Locations of Controls

22- Sequence of Operation

23- Start Up Procedures

28

- Safe Shutdown Test

28- Normal Inspection Procedures

29- Repair Section

31 5. TROUBLE SHOOTING GUIDE

33- Adjustments/Replacements of Components

346. REPLACEMENT PARTS LIST

These instructions are provided to assure the proper installation and operation of Raypak boilers. Should questions arise regarding the specifications, installa- tion, operation or servicing of these boilers, we suggest that the local Sales representative or the factory be consulted.

2

Page 2
Image 2
Raypak 0090B 0135B Contents, Receiving Equipment, General Specifications And Dimensions, Installation Procedures