Raypak 302-902 manual Outdoorinstallations, Outdoor Installation Minimum Clearances, Boiler Size

Models: 302-902

1 65
Download 65 pages 14.73 Kb
Page 10
Image 10
OUTDOORINSTALLATIONS

OUTDOORINSTALLATIONS

Raypak Hi Delta Boilers are design certified for outdoor installation. Boilers must not be installed under an overhang that is less than three (3) feet from the top of the boiler. Three (3) sides must be open in the area under the overhang. Roof water drainage must be diverted away from boilers installed under overhangs.

TABLE 2

OUTDOOR INSTALLATION MINIMUM CLEARANCES

 

Boiler Size

Boiler Side

302-902

Rear

12"

Right

36”

Left

36"

Top

Unobstructed

Vent

N/A

These clearances required where the outdoor vent cap is used. If installing the boiler outdoors with a vent stack, the indoor clearances may be used.

The air filter box can be installed on top of the boiler or the rear of the boiler.

For outdoor installations in snow prone areas, it is recommended that the filter kit be installed on to the rear of the boiler, to prevent recirculation and blockage.

 

Fig # 9297

SIDEVIEW

FRONT VIEW

10

Page 10
Image 10
Raypak 302-902 manual Outdoorinstallations, Outdoor Installation Minimum Clearances, Boiler Size, Boiler Side