The black (hot) wire leads you directly to the Main Power Switch. This switch is located at the bottom right-front corner of the control compartment. When the main power switch is placed in the “ON” position, both the 120 v and 24 v terminal blocks on the Main Circuit Board will be powered and the power light will turn on. When the Auto On- Off switch is turned ON, the following 24 v safety components are immediately energized: Low Water Cut-off, Blocked Vent Switch, Manual Reset Limit Control, Low Gas Pressure Switch (optional) and the High Gas Pressure Switch (optional). At this point if all the preceding safety switches are closed, then Relay K 1 (n.c.) will be energized and the safety light will turn off. The boiler is now ready for a call for heat.

HI-DELTAModel 502-752

The black (hot) wire leads you directly to the Main Power Switch. This switch is located at the bottom right-front corner of the control compartment. When the main power switch is placed in the “ON” position, both the 120 v and 24 v terminal blocks on the Main Circuit Board will be powered and the power light will turn on. When the Auto On- Off switch is turned ON, the following 24 v safety components are immediately energized: Low Water Cut-off, Blocked Vent Switch, Manual Reset Limit Control, Low Gas Pressure Switch (optional) and the High Gas Pressure Switch (optional). At this point if all the preceding safety switches are closed, then Relay K 1 (n.c.) will be energized and the safety light will turn off. The boiler is now ready for a call for heat.

When STAGE 1 calls for heat, the CALL FOR HEAT LIGHT will turn on. The Economaster Board will be energized and the pump will turn on. If the pump generates enough flow to activate the flow switch, the flow light will turn on, then power will be applied to the thermostat terminal of the Ignition Module and the Blower will activate.The Air Pressure Switch will close, and the pressure switch terminal on the Ignition Module will be energized the blower light will turn on. The Unit will now undergo a 15 second pre-purge. After the pre-purge cycle, Hot Surface Igniter will heat up. The heat-up period takes about 30 seconds after which a trial for ignition is initiated. During the trial for ignition, which lasts for four seconds, power is applied to Firing Valve No. 1. If within four seconds, the Remote Sensor establishes flame rectification, the Firing Valve No. 1 stays open and the Stage 1 light will turn on. Also, the Valve terminal from the ignition Module will power Relays K2, and K3.

When Stage 2 calls for heat, power will pass through the Time Delay Relay, then after 10 seconds through Relay K2, and then applied to Firing Valve No. 2, and the Stage 2 light will turn on.