Manuals
/
Raypak
/
Household Appliance
/
Boiler
Raypak
500, 750, 1000 Figure A-1, Advanced Design Boiler Component Locations
Models:
1000
750
500
1
6
74
74
Download
74 pages
30.35 Kb
3
4
5
6
7
8
9
10
<
>
Install
Figure L-2 WIRING DIAGRAM
Maintenance
Figure L-1 CPW Board Pump Turn-offDelay
Main Burner Adjustment 1.Turn unit off
See Tables O-2and O-3 for Pressure Settings
Cleaning Boiler Heating Surfaces
Section M General Safety Precautions
Section I Electrical Power Connections
Freeze Protection Feature
Page 6
Image 6
Figure
A-1
ADVANCED DESIGN BOILER COMPONENT LOCATIONS
6
Page 5
Page 7
Page 6
Image 6
Page 5
Page 7
Contents
OPERATING AND INSTALLATION INSTRUCTIONS
Models 500,750,1000
ADVANCED DESIGN BOILER
DANGER
TABLE OF CONTENTS PAGE NO
SECTION A BEFORE INSTALLING THE BOILER
DANGER
MODELIDENTIFICATION
Figure A-1
ADVANCED DESIGN BOILER COMPONENT LOCATIONS
SECTION B BOILER INSTALLATION
CLEARANCES
Page
SECTION C COMBUSTION AND VENTILATION AIR
Method 2 normally applied in cold climate regions
SECTION D WATER PIPING - GENERAL
SECTION E HYDRONIC HEATING PIPING
PRESSURE DROP IN FEET OF HEAD FEEDWATER REGULATOR
Figure E-2b
SINGLE BOILER - PRIMARY/SECONDARY PIPING WITH CHX
Figure E-3a DUAL-BOILERPRIMARY/SECONDARY PIPING
Figure E-3b
DUAL BOILER -PRIMARY/SECONDARYPIPING WITH CHX
Figure E-4a
SECTION F DOMESTIC HOT WATER PIPING
Figure F-1bb
Figure F-1c
SECTION G POOL HEATING
SPAWATER CHEMISTRY
Figure G-3a DOUBLE BOILER - POOL APPLICATION
SECTION H GAS SUPPLY CONNECTIONS
DANGER
See Tables O-2and O-3 for Pressure Settings
SECTION I ELECTRICAL POWER CONNECTIONS
MAKING THE ELECTRICAL CONNECTIONS
ELECTRICAL CONNECTIONS - DOMESTIC HOT WATER
SECTION J VENTING CONNECTIONS
GENERAL
Page
Support of Vent Stack
Venting Installation Tips Support piping
Figure J-1
•Natural Draft Vertical Vent Termination
Page
Figure J-2
SECTION J-2
Heat Exchanger Category
HORIZONTAL THRU-WALLVENTING WITHOUT ADD-ON
·65’ of straight flue pipe
Category
SECTION J-3
Horizontal Thru-WallDirect Venting/Combustion Air
Figure J-3
·45’ of straight flue pipe
SECTION J-4
Vertical Direct Venting/Combustion Air Category
Vertical Direct Venting System Installation
Figure J-5 VERTICAL VENT CATEGORY IV WITH ADD-ON
CONDENSING HEAT EXCHANGER
Contact Manufacturer for Details
Vertical Vent Category IV with Add-onCondensing Heat Exchanger Installation
HORIZONTAL THRU-WALLVENTING WITH ADD-ON
SECTION J-6
Figure J-6
CONDENSING HEAT EXCHANGER
Horizontal Thru-wallVenting System Category IV Installation
CONDENSING HEAT EXCHANGER
Figure J-7
HORIZONTAL THRU-WALLDIRECT VENTING WITH ADD-ON
Contact Manufacturer for details
Horizontal Thru-wallDirect Venting System With Add-onCondensing Heat Exchanger Category IV Installation
Figure J-8 VERTICAL DIRECT VENTING WITH ADD-ON
SECONDARY CONDENSING HEAT EXCHANGER
Contact manufacturer for details
Vertical Direct Venting System With Add-onCondensing Heat Exchanger Category IV Installation
NOTICE
SECTION K CONDENSATE DRAIN
SECTION L CONTROLS
Figure L-1 CPW Board Pump Turn-offDelay
Freeze Protection Feature
Figure L-2 WIRING DIAGRAM
IGNITION CONTROL MODULE
LOW WATER CUT OFF OPTIONAL
SECTION M GENERAL SAFETY PRECAUTIONS
SECTION N PRE-START-UP
Blower T fitting detail Figure O-1
COMPONENT AND PRESSURE TAP LOCATIONS
SECTION O ADB INITIAL START-UP
2.4 Check the Gas Supply Pressure, Location
3.3 Main Burner Adjustment 1.Turn unit off
SECTION P POST START-UPCHECK
EMISSIONS GUIDELINES
Range
SECTION Q OPERATION
SECTION R MAINTENANCE
CLEANING BOILER HEATING SURFACES
Refer to Figure S-1for the following steps
APPENDIX A
Page
Page
Page
Page
Page
START-UPSETTINGS
8/98 Litho in U. S. A