750, 500, 1000 Blower T fitting detail Figure O-1, Component And Pressure Tap Locations
Models:
1000
750
500
1
58
74
74
Download
74 pages
30.35 Kb
55
56
57
58
59
60
61
62
<
>
Install
Figure L-2 WIRING DIAGRAM
Maintenance
Figure L-1 CPW Board Pump Turn-offDelay
Main Burner Adjustment 1.Turn unit off
See Tables O-2and O-3 for Pressure Settings
Cleaning Boiler Heating Surfaces
Section M General Safety Precautions
Section I Electrical Power Connections
Freeze Protection Feature
Page 58
Image 58
Blower "T" fitting detail.
Figure
O-1
COMPONENT AND PRESSURE TAP LOCATIONS
58
Page 57
Page 59
Page 58
Image 58
Page 57
Page 59
Contents
Models 500,750,1000
OPERATING AND INSTALLATION INSTRUCTIONS
ADVANCED DESIGN BOILER
DANGER
TABLE OF CONTENTS PAGE NO
SECTION A BEFORE INSTALLING THE BOILER
DANGER
MODELIDENTIFICATION
Figure A-1
ADVANCED DESIGN BOILER COMPONENT LOCATIONS
SECTION B BOILER INSTALLATION
CLEARANCES
Page
SECTION C COMBUSTION AND VENTILATION AIR
Method 2 normally applied in cold climate regions
SECTION D WATER PIPING - GENERAL
SECTION E HYDRONIC HEATING PIPING
PRESSURE DROP IN FEET OF HEAD FEEDWATER REGULATOR
SINGLE BOILER - PRIMARY/SECONDARY PIPING WITH CHX
Figure E-2b
Figure E-3a DUAL-BOILERPRIMARY/SECONDARY PIPING
DUAL BOILER -PRIMARY/SECONDARYPIPING WITH CHX
Figure E-3b
Figure E-4a
SECTION F DOMESTIC HOT WATER PIPING
Figure F-1bb
Figure F-1c
SECTION G POOL HEATING
SPAWATER CHEMISTRY
Figure G-3a DOUBLE BOILER - POOL APPLICATION
SECTION H GAS SUPPLY CONNECTIONS
DANGER
See Tables O-2and O-3 for Pressure Settings
SECTION I ELECTRICAL POWER CONNECTIONS
MAKING THE ELECTRICAL CONNECTIONS
ELECTRICAL CONNECTIONS - DOMESTIC HOT WATER
SECTION J VENTING CONNECTIONS
GENERAL
Page
Support of Vent Stack
Venting Installation Tips Support piping
Figure J-1
•Natural Draft Vertical Vent Termination
Page
Figure J-2
SECTION J-2
Heat Exchanger Category
HORIZONTAL THRU-WALLVENTING WITHOUT ADD-ON
·65’ of straight flue pipe
Category
SECTION J-3
Horizontal Thru-WallDirect Venting/Combustion Air
Figure J-3
·45’ of straight flue pipe
SECTION J-4
Vertical Direct Venting/Combustion Air Category
Vertical Direct Venting System Installation
CONDENSING HEAT EXCHANGER
Figure J-5 VERTICAL VENT CATEGORY IV WITH ADD-ON
Contact Manufacturer for Details
Vertical Vent Category IV with Add-onCondensing Heat Exchanger Installation
HORIZONTAL THRU-WALLVENTING WITH ADD-ON
SECTION J-6
Figure J-6
CONDENSING HEAT EXCHANGER
Horizontal Thru-wallVenting System Category IV Installation
CONDENSING HEAT EXCHANGER
Figure J-7
HORIZONTAL THRU-WALLDIRECT VENTING WITH ADD-ON
Contact Manufacturer for details
Horizontal Thru-wallDirect Venting System With Add-onCondensing Heat Exchanger Category IV Installation
SECONDARY CONDENSING HEAT EXCHANGER
Figure J-8 VERTICAL DIRECT VENTING WITH ADD-ON
Contact manufacturer for details
Vertical Direct Venting System With Add-onCondensing Heat Exchanger Category IV Installation
NOTICE
SECTION K CONDENSATE DRAIN
SECTION L CONTROLS
Figure L-1 CPW Board Pump Turn-offDelay
Freeze Protection Feature
Figure L-2 WIRING DIAGRAM
IGNITION CONTROL MODULE
LOW WATER CUT OFF OPTIONAL
SECTION M GENERAL SAFETY PRECAUTIONS
SECTION N PRE-START-UP
Blower T fitting detail Figure O-1
COMPONENT AND PRESSURE TAP LOCATIONS
SECTION O ADB INITIAL START-UP
2.4 Check the Gas Supply Pressure, Location
3.3 Main Burner Adjustment 1.Turn unit off
EMISSIONS GUIDELINES
SECTION P POST START-UPCHECK
Range
SECTION Q OPERATION
SECTION R MAINTENANCE
CLEANING BOILER HEATING SURFACES
Refer to Figure S-1for the following steps
APPENDIX A
Page
Page
Page
Page
Page
START-UPSETTINGS