Raypak Advanced Design Boilers are design certified by AGA/CGA for outdoor installation. Roof water drainage must be diverted away from boilers installed under overhangs.
TABLE 2 |
|
|
|
OUTDOOR INSTALLATION MINIMUM CLEARANCES |
| ||
| Boiler Size |
|
|
Boiler Side | 500 | 750 | 1000 |
Rear | 6" | 6" | 6" |
Right | 36” (Water side) | 36" (Water side) | 36" (Water side) |
Left | 36" | 36" | 36" |
Top | 0" | 0" | 0" |
Vent | 1" | 1" | 1" |
WARNING:
Combustion air inlet (blower air inlet) should have 6" minimum clearance from any obstruction, i.e. walls or other appliances.
9