Section 1. GETTING STARTED | .3 |
THE BIG PICTURE | .3 |
WHAT COMES WITH THE CONTROLL | .4 |
Section 2. INSTALLING THE CONTROL | .4 |
ATTACHING THE TEMPERATURE SENSORS | .4 |
PROVIDING 24 VAC POWER TO CONTROL | .5 |
INSTALLATION LAYOUT | .6 |
”DIP” SWITCH SETTINGS ON CIRCUIT BOARD | .7 |
CONNECTING THE OPTIONAL “ELSA” BRAND MODEM | .8 |
USING THE FRONT PANEL TO CHECK SENSORS AND RELAYS | .9 |
Section 3. CONNECTING A COMPUTER (OR “LAPTOP”) | 10 |
BUILDING OR BUYING INTERFACE CABLES | 10 |
INSTALLING PTT SOFTWARE ON YOUR PC | 11 |
SIMULATED FRONT PANEL DISPLAY | 11 |
READING LOGGED DATA (Not All Models) | 12 |
USING YOUR PC AND MODEM TO CALL A CONTROL | 12 |
Section 4. PROGRAMMING | 14 |
QUICK REFERENCE | 14 |
FIRST SCREEN AT | 17 |
MANUAL OVERRIDE | 17 |
VIEW SENSORS AND RELAYS | 17 |
TIME AND DATE | 17 |
CELSIUS / FAHRENHEIT SCALE | 17 |
ERASE MEMORY / RESET PROGRAM | 18 |
SECURITY PASSWORD (“G” Models Only) | 18 |
FRONT PANEL MENU / LOCK | 18 |
TIME SCHEDULE | 19 |
SUPPLY TEMPERATURE | 19 |
RETURN TEMPERATURE | 21 |
BRANCH TEMPERATURE | 22 |
RELAY SEQUENCING | 22 |
SENSOR OVERRIDE TEST | 23 |
SAVINGS TEST SETUP | 24 |
SAVINGS TEST RESULTS | 24 |
SENSOR CALIBRATION | 25 |
LOCATION TEXT | 26 |
DATA MODEM SETUP | 26 |
FAX MODEM SETUP AND TEST (“G” Models Only) | 27 |
WARRANTY | 29 |
SERVICE/RETURN AUTHORIZATION PROCEDURE . . . . . . . . . . . . . . . . . . . . . . . . . . .29
2