Raypak Hot Water Energy Management Control PROVIDING 24 VAC POWER TO THE CONTROL, and checked

Models: Hot Water Energy Management Control

1 30
Download 30 pages 15.13 Kb
Page 5
Image 5
PROVIDING 24 VAC POWER TO THE CONTROL

On the sensor end, roll the shielding and tape so it will not contact a conductor. On the control end, the shield should be grounded. Do not ground both ends of the shielding.

Avoid routing wiring on or near other electrical wires, conduit, motors, spark igniters or other sources of high, intermittent voltage or current. EMI (spikes) can disrupt information flow and retention.

Procedure for Installing Supply Sensor in Tank:

1.Install sensor into dry well utilizing thermal conductive paste.

2.Install dry well into tank stat opening.

PROVIDING 24 VAC POWER TO THE CONTROL

!!! CAUTION !!!

DO NOT connect power until

all wiring is complete

and checked.

!!! CAUTION !!!

DO NOT connect 120 VAC

to the RayTemp!!!

Resulting damage will

void your warranty.

The RayTemp requires an external power transformer connected at terminals one and two. Complete and check all wiring before connecting this transformer. The transformer must be rated for 24 VAC at 16 VA or higher. When 24 VAC power is applied to the control the LCD display will be blank for a few seconds. During this time the RayTemp is configuring any modem that may be connected. After this the opening screen appears which identifies the model number, type of con- trol, software version, and copyright notice.

Sensor Connections

5

Page 5
Image 5
Raypak Hot Water Energy Management Control manual PROVIDING 24 VAC POWER TO THE CONTROL, and checked