1.Attach the Stabilizer (8) to the Frame (1) with two M10 x 116mm Carriage Bolts (38) and two M10 Nylon Locknuts (70).
2.Have another person hold the Upright (2) in the po- sition shown. Connect the Upper Wire Harness (77) to the Lower Wire Harness (78).
Attach the Upright (2) to the Frame (1) with four M10 x 25mm Patch Screws (48) and four M10 Split Washers (85). Make sure that no wires are pinched between the Upright and the Frame.
3.Attach the Track Frame (4) to the Frame (1) with two M10 x 123mm Button Screws (87) and two
M10 Split Washers (85). Finger tighten a Button Screw into the lower hole first, and then finger tighten a Button Screw into the upper hole. Then, tighten both Button Screws. Note: This step may be easier if you raise the Frame a few inches in the lo- cation shown by the arrow at the right while you at- tach the Track Frame.
1 |
|
|
|
38 | 8 |
|
|
|
|
| |
|
| 1 |
|
|
|
| 70 |
2 |
|
|
|
| 2 |
|
|
|
| 77 |
|
|
| 78 |
|
|
|
| 48 |
|
| 85 |
|
85 |
|
|
|
48 |
| 1 |
|
|
|
| |
85 |
|
|
|
3 |
|
|
|
1 | 85 | 87 |
|
|
| ||
|
| 85 | 87 |
|
|
| |
| 4 |
|
|
6