INSTALLATION

Leg and Bottom Shield Assembly

Bottom Shield

 

Small

850-121

Medium

850-221

Large

850-321

Legs (set of 4)

 

Steel - Painted Black

850-125

Cast - Painted Black

850-126

Cast - Gold Plated

850-127

The instructions below apply to the steel leg, painted cast leg and the gold plated cast leg. It will be easier to attach the legs to the stove if it is tipped on its back (preferably on a soft surface to prevent scratching).

1)Remove the 4 bolts in the underside of the base and discard.

2)Line up the bottom of the heat shield (with cover plate facing front) with the bottom of the unit.

3)Start threading the bolt and washer (sup- plied with the bottom shield) for about 1/4 of the way through the leg.

4)Place the spacers into position in the 4 corners of the bottom shield on top of the bolts.

STEP BY STEP

CHIMNEY AND

CONNECTOR

INSTALLATION:

Note: These are a generic set of chim- ney installation instructions. Al- ways follow the manufacturers own instructions explicitly. Check Table 1 on page 14 for the Mini- mum Recommended Flue Heights.

1)With your location already established, cut and frame the roof hole. It is recommended that no ceiling support member be cut for chimney and support box installation. If it is necessary to cut them, the members must be made structurally sound.

2)Install radiant shield and support from above.

3)Stack the insulated pipe onto your finish support to a minimum height of 3 feet above the roof penetration, or 2 feet above any point within 10 feet measured horizontally. There must be at least 3 feet of chimney above the roof level.

8)To complete your chimney installation, in- stall the double wall connector pipe from the stove’s flue collar to the chimney sup- port device.

9)If you are using a horizontal connector, the chimney connector should be as high as possible while still maintaining the 18" min- imum distance from the horizontal connec- tor to the ceiling.

10)NOTE: Residential Close Clearance and Alcove installations require a list- ed double wall connector from the stove collar to the ceiling level.

The diagrams below illustrate one way to install your unit into a standard ceiling or with a horizontal connector. Check with your dealer or installer for information on other options available to you.

5)Install all 4 legs with the washer underneath the leg and tighten the bolts.

6)Level the stove by adjusting the levelling bolts in the bottom of each leg.

Note: Increasing the chimney height above this minimum level will sometimes help your unit to “breathe” better by allowing a greater draft to be created. This greater draft can decrease prob- lems such as, difficult start-ups, back-smoking when door is open, and dirty glass. It might be suffi- cient to initially try with the mini- mum required height, and then if problems do arise add additional height at a later date.

4)Slide the roof flashing over your chimney and seal the flashing to the roof with roofing compound. Secure the flashing to your roof with nails or screws.

5)Place the storm collar over the flashing, sealing the joints with a silicone caulking.

6)Fasten the raincap with spark screens (if required) to the top of your chimney.

7)For optimum efficiency when installing into a masonry chimney, size accordingly, i.e. the 6" flue dia. is 28.28 sq.in.

Standard Ceiling Installation

Horizontal Installation

Regency Freestanding Woodstove