INSTALLATION
LOG SET
INSTALLATION
Read the instructions below carefully and refer to the diagrams. If logs are broken do not use the unit until they are replaced. Broken logs can interfere with the pilot operation.
The gas log kit contains the following:
a)
b)
c)
d)
e)
f)
g)
h)Embers
i)Rockwool
j)Vermiculite
Note: Install Optional Brick Panels prior to installing logs.
The "02" refer numbers (i.e.
molded into the rear of each log.
1)Carefully remove the logs from the box and unwrap them. The logs are fragile, handle with care - do not force into position.
2)Sprinkle the vermiculite around the fi rebox base. Take some of the embers (approx. 1/3 of the bag) and sprinkle over the vermiculite.
Vermiculite | Vermiculite | Vermiculite |
and embers. | and embers. | and embers. |
3) Place Rear Log | 6) Place the Left Top Log | |
the rear log support. | on Log | |
| on Log |
|
|
|
|
|
| |
|
| |
|
|
|
Pins on Rear Log Support | Pin | Cutout |
4) Place Front Right Log | 7) Place the notch in Center Log | |
pins as shown. | Log | |
|
| |
| ||
|
| |
|
| |
|
| |
5) Place the Middle Left Log | Notch | Cutout |
two pins as shown. |
|
|
Logs D)02-46 and E)02-47 in position.
8) Position notch in Front Right Log
Logs
NotchBracket
10 |